 |
 |
ACOE Design Documents and Inspections:
|
 |
 |
|
|
 |

|
|
|
Cayuga
Inlet: Local Flood Protection Project
(Modifications and Supplements)
-
2001
- Operations and maintenance manual for Cayuga Inlet and
flood control structures/facilities. Supersedes the 1978 O&M manual
-
1978 - Operations and maintenance manual for Cayuga Inlet and
flood control structures/facilities. Supersedes the 1970 O&M manual
1970
- Operations and maintenance manual for Cayuga Inlet and
flood control structures/facilities
1966
- Supplement to design document (realignment of channel)
1964 (1)
- Design document for improvements to Cayuga Inlet
1964 (2) - Supplement to design document (channel slopes and
levees)
1964 (3) - Supplement to design document (modification to channel
slopes)
1958
- Updated benefit: cost ratio for flood control measures,
showing that improvements to the Cayuga Inlet are justified.
1951
- Flood frequency analysis and the justification for flood
control measures along Cayuga Inlet. Report documents that costs of channel
improvements, including levees, would outweigh the benefits in reduced flood
damages.
|
|
|
|
|
|
 |
 |
 |
 |
|
Atwell
Mill Annex Suite S2 132 1/2
Albany St. Cazenovia, NY
13035 Ph
315.655.8305 Fax 315.655.4086 info@ecologicllc.com
Site maintained by EcoLogic,
LLC
Site hosted by PL E-Communications, LLC
|